Accumulator Weekly Test

Weekly accumulator function test (Category II) per Nordic PM Plan 9.0 Table 2. Accumulator system per 20 AAC 25.035(e)(4)(A) and API Std 53.

⚠️ This test is done weekly and recorded (Nordic PM Plan 9.0 Table 2). Ensure all personnel are clear of BOP stack before testing.
📋 Test Information
🔧 Accumulator Unit Information
⏱️ Closing Time Test Results
✅ Accumulator Test Checklist
Pre-Test Checks
Accumulator fluid reservoir level adequate
Nitrogen pre-charge pressure verified
All accumulator bottles visually inspected
Hydraulic fluid condition acceptable (no contamination)
All manifold valves in correct position
Personnel cleared from BOP stack area
Pump Performance
Electric pump starts and builds pressure
Air pump starts and builds pressure
Pump cycles within acceptable time
No abnormal pump noises or vibrations
Pump pressure relief valve functional
Closing Unit Test
Annular preventer closes within time limit (≤45 sec)
Pipe rams close within time limit (≤30 sec)
Blind/shear rams close within time limit (≤30 sec)
All BOPs open properly after closing test
Closing unit regulator functions properly
Pressure Tests
System maintains pressure (no leaks)
Pressure gauges reading accurately
Accumulator pressure drop within limits after closing
Sufficient volume to close all BOPs plus reserve
Remote Panels
Driller's panel functions properly
Remote panel functions properly
All indicator lights operational
Communication between panels verified
Safety & Documentation
Emergency shutdown tested
Previous test records reviewed
All deficiencies from last test corrected